Adding a schedule in Rubix-Edge-Wires
Important things to note before proceeding:
make sure flow-framework and rubix-edge wires are both installed and running
Step 1: On the device level, click into the 'schedules' icon on the side bar and click the 'create' button.
Step 2: Give the schedule a name and select the time zone.
Step 3: Once the schedule has been created, click the calendar button no the newly created schedule to select the type and times.
Step 4: Choose if your schedule is a one-off 'Event', a 'Weekly' or a holiday / one-off 'exception'. The below is an example of a weekly schedule.
Step 5: Enter in the name of the weekly schedule, select the applicable days and the start and finish schedule time.
Step 6: Open up the Rubix-Edge-Wires program and drop in a 'flow network' node
Step 7: Right-click to open up the sub flow node.
Step 8: Drop in flow-schedule node, then right-click the schedule node, select settings and and select the newly created schedule.
Step 9: Press the download (or ctl+s) button to apply the changes to the wiresheet.
Successfully adding in a schedule